Install joint, 2" x 4"s, to 9 foot side of each wooden floor, 3/4" down from top using 6pc - 3" long wood screws, as evenly spaced as possible per side.
Step 3

Using 20pc of 2" long wood screws fasten down the spacer strips directly over the 2" x 4" joints. Evenly space wood screws along entire length of spacer strip.
Step 5

Begin assembly with wooden floors on clean level surface.
Step 7

Secure back wall to the wooden floor using 1/4" x 2" lag bolts into the 5 predrilled holes. Continue holding back wall until at least two walls are connected together and lagged to the wooden floor.
Step 9

Install one side wall by inserting into the lockstrip just installed on the back wall vertical end.
Step 11

Secure both side walls to the wooden floor using 1/4" x 2" lag bolts into the 5 predrilled holes on each side.
Step 13

Insert fill Side Fill Panel into lockstrip and add lockstrip to other Side Fill Panel. Repeat this step for other side of storage unit.
Step 15

Install lockstrips (2) on each side wall, then insert front wall into lockstrips. Install 5pc of 1/4" x 2" lag bolts into predrilled holes to secure front wall to the wooden floor.
Step 17

Install Ridge Cap by inserting center rib between two roof panels.
Step 19

Secure roof to front and back walls with 16pc 1" long self-tapping screws (4pc per wall). These holes are not predrilled. Space screws evenly.
Step 20b

Install hinges on front wall using threaded plats. Threaded plate must be located inside slot. Install 4pc 5/16" nuts onto ends of 5/16" x 1" hex head bolts. Two bolts and nuts per hinge. Nuts not shown.
Step 20d

Install locking bar. Use 6pc of 1/4" x 1" carriage bolts, 6pc 5/16" washers, 6pc 1/4" washers and 6pc 1/4" nuts as shown above. Ensure rounded head of carriage bolt is on outside of building.

Place wooden floors with 2" x 4" joints together on level surface and position pre-cut spacers as shown.
Step 4

Install Face Joint to the center of the two joined wooden floors using 2pc of 1/4" x 2" lag bolts - one bolt per face joint on each side for the wooden floors.
Step 6

Position back wall as shown above.
Step 8

Install lockstrip to both vertical ends of back wall.
Step 10

Install second sidewall using foot to hold bottom of the side wall while inserting it into lockstrip on opposite end of the back wall.
Step 12

Install lockstrip on end of side wall and then install Side Fill Panel, as seen above on right hand side (see Step 13 for installation).
Step 14

Install next side wall panel. Repeat on other side wall. Then install 10pc 1/4" x 2" lag bolts to secure walls to wooden floor. 5 predrilled holes at the bottom of each wall.
Step 16

Place roof on top of the storage unit walls and simply pull it down into the channels until it bottoms out. Repeat with second roof piece.
Step 18

Secure Ridge Cap to roof and walls with 4pc 1" long self tapping screws. (2pc each end located so they screw into and have contact with the wall).
Step 20a

Install two door hinges on front wall using 4pc hex headed bolts, 5/16" x 1" and 2pc threaded plates. (See following illustrations).
Step 20c

Install door to hinge using re-enforcing hinge plates (2) and 6pc -1/4" carriage bolt, 1/4" lock washer and 1/4" nut per hinge. Align and tighten. Hinge plates must be inside door as shown.
Step 21

Completed Unit.
Click here for product details and to order Vestil Double Storage Unit.